Lake in the Hills puts decks on its list of projects that need a building permit, alongside fences, fire pits and gazebos. The village also publishes a short Deck Project Sheet that covers the whole process in a few pages: what to hand in, what gets inspected, and the small set of rules that decide whether a deck passes.

This guide walks through that sheet in plain terms, in the order you will meet it. It is written from the village’s own published document, so treat it as a map rather than the final word. Forms and rules get updated, and Community Development can confirm the current version before you submit.

What the village sheet says, in its own words

“Homeowners may build their own deck.” Deck Project Sheet

“A deck permit is a 2-month permit” Deck Project Sheet

“Final approval will not be given if the stair risers are not equal” Deck Project Sheet

 

At a Glance Lake in the Hills Deck Permits
Issued by Village of Lake in the Hills, Community Development
Address 600 Harvest Gate, Lake in the Hills, IL 60156
Contact (847) 960-7400 or cd@lith.org
Who can build Homeowners can build their own deck. A contractor must be licensed with the village before the permit is issued.
What to submit Application, plat of survey showing the deck, deck checklist, a cross-section, and a dimensioned plan view. Add the contractor’s proposal if you are using one.
Review time About 10 business days
Fee Paid when you pick up the approved permit, not when you apply
Inspections Pier holes before concrete, rough framing before the deck boards, and a final
Permit length Two months, and the final inspection must be passed inside that window
Scheduling Inspections are booked through the village’s online public portal at lith.org/public-portal

What to Submit

What to Submit

The village asks for a complete package up front, and most delays come from a missing piece rather than a problem with the deck itself. The sheet lists these items:

  1. A completed building permit application. It asks for the property’s township (Algonquin or Grafton), the estimated cost and the square footage.
  2. A copy of your plat of survey, marked to show where the new deck goes and every other existing structure on the lot, such as a shed, patio or pool.
  3. The contractor’s proposal, itemizing the work, if a contractor is building it.
  4. The village’s deck checklist, filled in.
  5. A cross-section of the deck, drawn from the side.
  6. A bird’s eye view of the deck with dimensions, showing the location of every pier, beam and stair.

The checklist is where the design has to be finished rather than sketched. It asks for the deck’s overall size and material, its height above the yard, the joist size (drawn at 16 inches on center), the footing diameter at 42 inches below existing grade, the post size, the beam size, and the span of each beam.

No payment is due when you submit. The village reviews the drawings, and you pay for the permit when you pick it up from Village Hall. The sheet asks for about 10 business days between submitting and the permit being issued, so build that into the schedule, especially in spring.

The Three Inspections

Every permit in Lake in the Hills comes with inspections, and a deck gets three of them.

The first is the pier inspection. It happens after the post holes are dug and before any concrete goes in, and it confirms the holes reach 42 inches below the existing grade. Pour first and there is nothing left to inspect.

The second is the rough framing inspection, done after the frame is built and before the deck boards go on. This is the inspector’s only clear view of the joists, beams and connections, which is why it comes before the surface hides them.

The third is the final, when the deck is complete. The village is direct about one thing at this stage: final approval will not be given if the stair risers are not equal in height, and that includes the bottom step down to the ground. A riser that is half an inch off because the ground settled is the kind of detail that sends a finished deck back for rework.

One more date matters. A deck permit lasts two months, and the approved final inspection has to happen inside that window. Before anyone digs, the village sheet also asks you to call J.U.L.I.E. at 800-892-0123 at least 72 hours ahead so buried utility lines can be marked.

The Rules the Drawings Have to Meet

The Deck Project Sheet lists the requirements a deck is checked against. They are short, and most of them are about footings, railings and stairs.

Item What the village requires
Setbacks Must meet the setbacks in Zoning Section 13.2-1A. A deck may not encroach on any easement.
Posts Must be resistant to rot and decay
Piers At least 42 inches deep to existing grade, inspected before you continue
Guardrails Required on all open sides when the deck is more than 30 inches above the ground. At least 36 inches high and no more than 42 inches.
Balusters Clear opening between them no more than 4 inches and no less than 2 inches
Handrail Required on at least one side of any stair with 4 or more risers. Three steps means four risers.
Stair width At least 3 feet. Wider stairs need extra stringers.
Risers All equal in height, 7 3/4 inches at most, including the bottom step to the ground
Treads At least 10 inches deep
Escape windows The deck must not cover them

The village prints the equal-riser rule twice on a four-page sheet, which says something about how often it comes up. Work the stair out on paper from the actual deck height before the frame goes up, and the final inspection is far less likely to hold the project up.

Location, Directions and Access

Village Hall is at 600 Harvest Gate, Lake in the Hills, IL 60156, a short drive off Randall Road. Community Development can be reached at (847) 960-7400 or by email at cd@lith.org, which the village lists as the place to ask whether a project needs a permit at all.

Hours

The village’s Google listing shows Village Hall open Monday to Friday, 8:30 a.m. to 5:00 p.m., and closed at weekends. Since the permit has to be picked up in person, it is worth confirming hours before you drive over.

  • Get your contractor licensed with the village first. The permit will not be issued until that is done.
  • Ask for the current deck checklist before drawing. It tells you exactly which dimensions the reviewer wants to see.
  • Book inspections through the online portal, and leave room in the two-month window for a re-inspection.
  • Measure stair risers from the finished ground, not the ground on the day the frame went up.

Planning the Deck Before the Paperwork

Planning the Deck Before the Paperwork

The checklist asks for joist size, beam size, post size, footing diameter and beam spans before anything is approved, which means the design has to be settled before the application goes in. Reading through the steps to build a deck in the right order makes the checklist easier to fill in, because it follows the same sequence the village inspects: footings, posts, beams, joists, then the surface and the stairs.

Money is worth settling at the same stage. The permit fee is paid at pickup, but the bigger numbers are materials and labor, and budgeting before the permit fee helps avoid redrawing a plan later to fit a number that was never realistic.

Many homeowners hand the whole process to a contractor, in which case the contractor has to be licensed with the village before a permit is issued. Platinum Decking builds decks, porches and outdoor living spaces across McHenry and Lake counties, and if you would rather hand off the build, deck builders in Lake Barrington who work in Lake in the Hills can take it on. Whoever you hire, ask them to confirm their village license before you expect a permit.

And if the plan stalls while you wait on review, the beach and trails at Three Oaks are a short drive east in Crystal Lake, and a good place to look at how other people use their outdoor space.

Frequently Asked Questions

Do I need a permit to build a deck in Lake in the Hills?

Yes. Decks are on the village’s list of projects that require a building permit. If you are unsure about a smaller project, the village asks you to call (847) 960-7400 or email cd@lith.org.

Can I build the deck myself?

Yes. The village allows homeowners to build their own deck. The sheet is clear that the homeowner is then responsible for the permit in its entirety, including any damage to streets, curbs, sidewalks, driveways and trees in the public right-of-way during construction.

How long does the permit take?

The village asks you to allow about 10 business days after submitting a complete application. Missing documents add time.

When do I pay?

When you pick up the approved permit at Village Hall. Payment is not due at submission.

How deep do the footings need to be?

Piers must reach at least 42 inches below the existing grade, and they are inspected before the concrete is poured.

What most often holds up final approval?

Uneven stairs. The village will not give final approval if the stair risers are not all equal in height, including the step down to the ground.

The Bottom Line

The Lake in the Hills deck permit is not complicated, but it is specific. The village wants a finished design on paper, three inspections at fixed points in the build, and a deck that passes final inside two months.

The sheet itself flags three points: a contractor who is not yet licensed with the village, concrete poured before the pier inspection, and stair risers that do not match. Get those right and the rest is paperwork.

Call (847) 960-7400 to confirm the current deck sheet before you draw anything, and plan the stairs first. They are the part the inspector checks last and the part most likely to send you back.